No other lift built my posterior chain like stiff-leg deads from a 4-inch deficit. From the upper back to erectors to hamstrings, this was my "go to" for total posterior chain smashing. I eventually worked up to over 600 pounds for reps on these.
related posts
Tip: The Cure for Functional Weak Links
Every lifter needs more rotational work in his programming. Try this exercise.
Dr John Rusin April 16
Death to Crunching
Ditch the traditional core exercises and try out a few of these athletic moves for stronger abs.
Scott Abel October 29
Top 5 STRICT Bodyweight Exercises
Do you do them all? Master all these moves to become an all-around more awesome human.
Tanner Shuck June 13
Tip: Do 50 Reps in 5 Minutes
The fastest, toughest workout strategy you'll ever use. Take a look.
TC Luoma October 30